On-site machine processing and maintenance
Flow of order to delivery for on-site processing
- 1. Notice from a user of on-site machine processing
- 2. Machine type for processed material (e.g. press, air hammer, and other industrial machine)
- 3. Presentation of details about the size of processed material, space, etc. (e.g. drawings, photographs, etc.)
- 4. Presentation of estimated specification
- 5. Preliminary on-site examination on an as-needed basis by sales person and technical staff
- 6. Presentation of cost estimate and timetable
- 7. Discussion about order
- 8. Acceptance of purchase order
- 9. Customers are requested to ensure the following provisions
①Attendance of responsible observers during construction work
②Power supply of 200 V, 60 A or higher
③Pneumatic supply of 4 K or higher
④Machine yard of around 20 ㎡ near the construction site
⑤Borrowing of overhead travelling crane and forklift
⑥Parking lots for a heavy truck and a van - 10. Start of construction
- 11. Record of pre-construction state check
- 12. Receipt of signature for construction daily report
- 13. Witnessed inspection of completed construction
- 14. Presentation of construction record (inspection report)